Provisions the documents cite: whole
What it requires
Demolition code of practice. BSI status: Current.
The instrument itself: https://knowledge.bsigroup.com/products/code-of-practice-for-full-and-partial-demolition/standard. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: checked against the source on the date shown.
- Watched by: check for amendment, withdrawal or a new edition at each monthly horizon scan.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 17 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Demolition & Strip-Out RAMS
- Asbestos Interface — Stop-Work and Discovery
- Concrete Breaking, Bursting and Crushing
- Cutting and Removal of Structural Openings
- Hand Demolition and Hard Strip
- Soft Strip of Internal Finishes and Fittings
- Structural Demolition — Machine
- Temporary Works Interface During Demolition
Demolition & Strip-Out topic RAMS
- Demolition Dust Suppression and Monitoring
- Demolition Next to Retained Structures
- Hand Dismantling of Pitched Timber Roofs
- Pre-Demolition Hazardous Strip
Demolition and strip-out quality checklists
- Pre-Strip Survey and Services Isolation — Quality Inspection Checklist
- Salvage, Retained Items and Protection — Quality Inspection Checklist
- Strip-Out Complete — Area Handover — Quality Inspection Checklist
- Structural Protection and Propping in Place — Quality Inspection Checklist