Provisions the documents cite: Part A (design, installation and commissioning), Part B (operational management) — flushing, disinfection, sampling; Part C (Pseudomonas aeruginosa and augmented care)
What it requires
The NHS standard for water systems in healthcare premises, including commissioning by flushing and disinfection and the sampling regime before a system is put into use.
How this entry is kept current
- Citation status: carried from drafting; a source check is in the monthly scan queue.
- Watched by: publication page check each scan.
- Automated scan: no public page to watch; checked by hand in the monthly review.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 22 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Healthcare estates
- Authorised Person and Competent Person Appointment Record
- Infection Control Risk Assessment and Permit
- Ward and Department Handback Certificate
- Water Systems Work Authorisation and Flushing Record
Healthcare services quality checklists
- Clean Rooms and Pressure Regimes — Quality Inspection Checklist
- Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist
- Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist
- Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist
Mechanical services quality checklists
- Cold Rooms, Catering and Specialist Plant — Quality Inspection Checklist
- Commissioning and Balancing — Witness — Quality Inspection Checklist
- Ductwork Cleanliness and Leakage Testing — Quality Inspection Checklist
- Ductwork — Supports, Joints, Fire Dampers and Access — Quality Inspection Checklist
- Gas Installation — Tightness, Purge and Commissioning — Quality Inspection Checklist
- Insulation, Vapour Seal and Identification — Quality Inspection Checklist
- Pipework First Fix — Routes, Supports, Sleeves and Identification — Quality Inspection Checklist
- Plant Installation — Bases, Vibration Isolation and Connections — Quality Inspection Checklist
- Pressure Testing — Water, Heating and Gas-Free Systems — Quality Inspection Checklist
- Sanitaryware and Second Fix — Quality Inspection Checklist
- Underfloor Heating — Loops and Pressure Test — Quality Inspection Checklist
- Water Hygiene — Flushing, Chlorination and L8 Records — Quality Inspection Checklist