Provisions the documents cite: Part A (design, installation, validation and verification) and Part B (operational management, the permit-to-work system)
What it requires
The NHS standard for medical gas pipeline systems: installation by competent persons, the permit-to-work operated by the Authorised Person (MGPS), pressure and purity testing, and validation before use.
How this entry is kept current
- Citation status: carried from drafting; a source check is in the monthly scan queue.
- Watched by: publication page check each scan.
- Automated scan: no public page to watch; checked by hand in the monthly review.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 10 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Healthcare estates
- Authorised Person and Competent Person Appointment Record
- Medical Gas Pipeline Systems Permit to Work
- Ward and Department Handback Certificate
Healthcare services quality checklists
- Clean Rooms and Pressure Regimes — Quality Inspection Checklist
- Medical Gases — Pipework, Pressure, Purity and AP Witness (HTM 02-01) — Quality Inspection Checklist
- Nurse Call, Bed-Head Services and Pendants — Quality Inspection Checklist
- Radiation Shielding — Lead-Lined Boards and Doors — Quality Inspection Checklist