KubitDocs · Legislation

HSE HSG248 — Asbestos: The analysts' guide (2nd edition, 2021)

Provisions the documents cite: whole guidance — including the four-stage clearance procedure and the certificate of reoccupation

What it requires

The analyst's procedure at the end of licensed asbestos removal: preliminary check of site condition and job completeness, thorough visual inspection inside the enclosure, air monitoring, and the final assessment after dismantling the enclosure, ending in the certificate of reoccupation.

How this entry is kept current

  • Citation status: carried from drafting; a source check is in the monthly scan queue.
  • Watched by: check for amendment, withdrawal or a new edition at each monthly horizon scan.
  • Automated scan: no public page to watch; checked by hand in the monthly review.

Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.

The 4 documents that cite it

Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.

Asbestos management

Asbestos removal quality records