Provisions the documents cite: whole document
What it requires
Electrical safety practice for construction sites — temporary installations, reduced low voltage, inspection cycles.
The instrument itself: https://www.hse.gov.uk/pubns/books/hsg141.htm. The summary above is our plain-English reading, not the text of the instrument — always work from the source.
How this entry is kept current
- Citation status: carried from drafting; a source check is in the monthly scan queue.
- Watched by: page hash + edition check.
- Source last checked by the automated scan: 2026-09-01.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 6 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.