Provisions the documents cite: whole standard — planning, equipment, anchors, rescue and records for rope access
What it requires
The practice for industrial rope access: two independently anchored lines, equipment inspection and records, and a rescue plan that can be carried out.
How this entry is kept current
- Citation status: carried from drafting; a source check is in the monthly scan queue.
- Watched by: check for amendment, withdrawal or a new edition at each monthly horizon scan.
- Automated scan: no public page to watch; checked by hand in the monthly review.
Every source is re-checked monthly and the result is published in the scan log. A change that alters what a document should say raises a revision, and past buyers of that document are told.
The 6 documents that cite it
Every KubitDocs document prints its statutory basis on the form itself, so the person signing can verify the citation rather than take our word for it.
Access and lifting inspection checklists
- Hoists — Erection, Tie-In and Inspection — Quality Inspection Checklist
- Lifting Equipment — Thorough Examination and Lift Plan Check — Quality Inspection Checklist
- Rope Access and Specialist Access — Daily Record — Quality Inspection Checklist
- Scaffold Handover and Weekly Inspection — Quality Inspection Checklist